Medición de la productividad en obra aplicando la metodología lean construction en el proyecto de saneamiento junta vecinal San Rafael Arcángel, Nauta 2022

dc.contributor.advisorArévalo Flores, Jefree Stefano
dc.contributor.authorSaldaña Reyna, Deyvi
dc.contributor.authorTaricuarima Maytahuari, Freddy Ricardo
dc.date.accessioned2022-12-27T15:58:28Z
dc.date.available2022-12-27T15:58:28Z
dc.date.issued2022-11-11
dc.description.abstractEl presente trabajo de investigación se realizó con la finalidad de dar a conocer la metodología LEAN CONSTRUCTION y como esta herramienta ayuda a medir la productividad en obra específicamente con la carta de balance, en el proyecto de saneamiento denominado: “MEJORAMIENTO, AMPLIACIÓN DEL SISTEMA DE AGUA POTABLE, SANEAMIENTO Y TRATAMIENTO DE AGUAS SERVIDAS DE LA CIUDAD DE NAUTA, PROVINCIA DE LORETO – LORETO", el objetivo general se basó en Aplicar la Metodología Lean Construction (carta de Balance) para medir la productividad de tres (3) partidas de la obra en saneamiento Junta Vecinal San Rafael Arcángel-nauta 2022, el tipo de investigación utilizada es descriptiva, así como el diseño de estudio fue no experimental debido a que no se manipulo ninguna variable para obtener la información es decir se colocó el Trabajo Productico(TP), Trabajo Contributorio (TC) y Trabajo no Contributorio(TNC) tal y como se muestran en la realidad. La fuente de información que accedimos fueron tesis con referente a LEAN CONSTRUCTION, como instrumento de recolección de datos se aplicó el formato de la Carta Balance para poder medir la productividad en las partidas estudiadas; en conclusión luego de medir la productividad utilizando la carta de balance en las partidas: Cama de arena, instalación de tubería, relleno y compactación, estudiadas en la etapa n° 1 de recopilación de información mediante observación visual en 5 días se obtuvo: TP=51.33%, TC=23.85%, TNC= 24.81%. Significa que hay un alto índice de Trabajo productivo sin embargo para llegar al optimo es necesario aplican Lean Construction diversos estudios lo certifican.es_ES
dc.description.abstractThe present work of investigation was carried out with the purpose of making to know the “LEAN CONSTRUCTION” methodology and how this tool helps to measure productivity in work place specifically with the balance sheet, in the sanitation project named: “IMPROVEMENT, EXPANSION OF THE SYSTEM OF DRINKING WATER SANITATION AND WASTEWATER TREATMENT OF THE CITY OF NAUTA, PROVINCE OF LORETO – LORETO”, the general Objective was based on applying the Lean Construction (balance sheet) to measure the productivity of three (3) items of the work in sanitation “Junta vecinal San Rafael Arcángel – Nauta 2022”, the kind of investigation used is descriptive, with non-experimental design because no variable was manipulated to get the information, that is, they were placed in Productive work (P.W.), Contributory work (C.W.) and Non – Contributory work (N.C.W.) as it was showed in reality. The source of information that we accessed were theses related to LEAN CONSTRUCTION, as a data collection instrument the balance sheet form was applied in order to be able to measure the productivity of work items observed in this study; in conclusion, after measuring productivity by using the balance sheet in the items: sand bed, pipe installation, filling and compaction, studied in stage n°1 of information gathering through visual observation in five days, the following was obtained : PW = 51..33%, CW = 23.85%, NCW = 24.81%. It means that there is a high index of productivity work however, to reach the optimun it is necessary to apply LEAN CONSTRUTION, many studies certify it.En_us
dc.description.uriTesises_ES
dc.formatapplication/pdfes_ES
dc.identifier.urihttp://hdl.handle.net/20.500.14503/2127
dc.language.isospaes_ES
dc.publisherUniversidad Científica del Perúes_ES
dc.publisher.countryPEes_ES
dc.rightsinfo:eu-repo/semantics/openAccesses_ES
dc.rights.urihttp://creativecommons.org/licenses/by-nc-nd/3.0/us/*
dc.subjectLean constructiones_ES
dc.subjectProductividad en obraes_ES
dc.subjectLean constructionEn_us
dc.subjectProductivity work placeEn_us
dc.subject.ocdehttps://purl.org/pe-repo/ocde/ford#2.01.00es_ES
dc.titleMedición de la productividad en obra aplicando la metodología lean construction en el proyecto de saneamiento junta vecinal San Rafael Arcángel, Nauta 2022es_ES
dc.typeinfo:eu-repo/semantics/bachelorThesises_ES
renati.advisor.dni70557828es_ES
renati.advisor.orcidhttps://orcid.org/0000-0002-4779-0148es_ES
renati.author.dni47405839es_ES
renati.author.dni75696751es_ES
renati.discipline732267es_ES
renati.jurorGarcía Langer, Carol Begoñaes_ES
renati.jurorSaldaña Ferreyra, Keusones_ES
renati.jurorCabanillas Oliva, Erlin Guillermoes_ES
renati.levelhttp://purl.org/pe-repo/renati/level#tituloProfesionales_ES
renati.typehttps://purl.org/pe-repo/renati/type#tesises_ES
thesis.degree.disciplineIngeniería Civiles_ES
thesis.degree.grantorUniversidad Científica del Perú. Facultad de Ciencias e Ingenieríaes_ES
thesis.degree.levelTitulo Profesionales_ES
thesis.degree.nameIngeniero Civiles_ES

Files

Original bundle

Now showing 1 - 1 of 1
Thumbnail Image
Name:
SALDAÑA REYNA DEYVI Y TARICUARIMA MAYTAHUARI FREDDY RICARDO - TESIS.pdf
Size:
4.93 MB
Format:
Adobe Portable Document Format
Description:

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.3 KB
Format:
Item-specific license agreed upon to submission
Description:

Collections